Yichang is the important location of national strategic facilities such as the Three Gorges Dam and Gezhou Dam, and is known as "the capital of hydropower in the world." In January 2002, Weite was established in Yichang. In August 2002, Weite's first product was used in hydropower stations. Over the past 18 years, the hydropower business has been intensively cultivated as the main position of Weite. At present, the business has covered most large and medium-sized hydropower stations in the country. Today, I will take you to count the top ten hydropower stations in China. Are they all related to Weite?
No. 1 power station: Three Gorges Hydropower Plant
The Three Gorges Hydropower Station in Yichang, Hubei is not only the number one Dam in China, but also the number one Dam in the world. The total installed capacity is 22.5 million kilowatts, and the annual power generation is about 90 billion kilowatt hours, which is equivalent to the annual electricity consumption of a medium province. It has made outstanding contributions to China's power supply, energy conservation and emission reduction.
Service items: In 2018, Weite Technology Co., Ltd. installed a safety monitoring system for 20 units large overhead cranes in the Three Gorges Power Plant.
The project passed the owner's acceptance.
Three Gorges Power Plant 1200T Bridge Crane
Acceptance of 1200T bridge crane monitoring system of Three Gorges Power Plant
Interface of 1200T bridge crane monitoring system of Three Gorges Power Plant
Acceptance of the monitoring system for the dam crest gate machine of the Three Gorges Power Plant.
No.2 power station: Baihetan Power Station (under construction)
Baihetan Hydropower Station is the second cascade power station on the Jinsha River. It was originally planned to have an installed capacity of 16 million kilowatts. Now some of the units are generating electricity first, and all projects are expected to be completed in 2022.
Baihetan Hydropower Station under construction
Service items: The crane safety monitoring system produced by Weite is used in the construction crane of Gezhouba Mechanical and Electrical Engineering Bureau to help the construction of Baihetan Hydropower Station.
No.3 power station: Xiluodu Power Station
The Xiluodu Hydropower Station is also located on the Jinsha River, with a total installed capacity of 13.86 million kilowatts. The project was completed and put into operation in 2014 and is the backbone power supply from west to east.
Xiluodu Hydropower Station
Service items: In 2015, Weite carried out an overhaul project for the rapid gate control system of the unit of Xiluodu Power Station, which was approved by users!
Xiluodu Hydropower Station Quick Gate Control System 1
Xiluodu Hydropower Station Quick Gate Control System 2
No.4 power station: Wudongde Power Station (under construction)
Wudongde Hydropower Station is the first cascade power station on the Jinsha River. It was originally planned to have an installed capacity of 10.2 million kilowatts and is currently under construction.
Udongde Hydropower Station under construction
Service items: In October 2019, the Weite crane safety monitoring system is matched with the portal machine produced by Gezhouba Machinery Factory to protect the door machine of the Udongde Hydropower Station under construction!
Tail gate of Wudongde Hydropower Station
WTSM type monitoring system installed in the tail gate of Wudongde Power Station
No.5 power station: Xiangjiaba Power Station
Xiangjiaba Hydropower Station is the last hydropower station on the Jinsha River, with a total installed capacity of 7.75 million kilowatts. The "Upward Project" ± 800KV UHV DC demonstration project was sent from here.
Panoramic view of the dam of Xiangjiaba Power Plant
Service items: In 2018, Weite installed a monitoring system for 11 units large lifting equipments in the whole plant of Xiangjiaba Power Plant; in 2018-2019, Weite separately provided the inlet gates, left and right banks to the left and right bank power plants of Jiaba Power Plant An underwater monitoring system is added to the hydraulic grab beam of the tailgate, and it is put into use smoothly!
Weite special underwater monitoring video system installed in Xiangjiaba Power Plant
Weite engineer and the staff of Xiangjiaba Power Plant took a group photo
No.6 power station: Longtan Hydropower Station
Longtan Hydropower Station is a landmark project of power transmission from west to east, and the highlight of the western development. The total installed capacity is 6.3 million kilowatts. The project was completed and put into operation in 2009, with an annual power generation capacity of 18.7 billion kilowatt hours.
Panorama of Longtan Hydropower Station
Project Introduction: In 2018, Weite Technology Co., Ltd. installed a safety monitoring and management system for 8 units large bridge gantry cranes in the entire Longtan Power Plant.
Weite installs safety monitoring system for Longtan Hydropower Station
Weite installed a monitoring system for the overhead crane of the Longtan Hydropower Plant workshop to protect the unit maintenance
No.7 power station: Nuozhadu Hydropower Station
The Nuozhadu Hydropower Station is located in the lower reaches of the Lancang River and has a total installed capacity of 5.85 million kilowatts. It is the largest hydropower station in Yunnan Province and one of the power transmission points from west to east.
Panorama of Nuozhadu Hydropower Station
Project Introduction: Weite completed the installation and commissioning of the underwater visual monitoring and management system of the tail water trolley of Nuozhadu Hydropower Station in September 2016, and passed the acceptance by the owner.
Tail water trolley of Nuozhadu Hydropower Station
Underwater monitoring system installed in tailrace trolley of Nuozhadu Hydropower Station
No.8 power station: Jinping II Hydropower Station.
Jinping II Hydropower Station is located in the Yalong River. It uses natural drop to directly excavate the tunnel to divert water to generate electricity. It is the largest hydraulic tunnel in the world. The total installed capacity is 4.8 million kilowatts, and the annual power generation is about 24.2 billion per year.
Jinping II Hydropower Station
Project Introduction: In December 2018, the safety monitoring and management system of 4 units bridges and portal cranes of Jinping Second-level Power Station installed by Weite successfully checked and accepted the owner and special inspection, and the current operation status is excellent.
Video screen of Jinping second-level hydropower station monitoring system
Interface of bridge monitoring and control system for Weite special Jinping second-level hydropower plant
Weite installed a monitoring system for the bridge machine of the Jinping second-level hydropower plant workshop to escort the maintenance of the unit
No.9 power station: Xiaowan Hydropower Station
The Xiaowan Hydropower Station is located in the middle reaches of the Lancang River, which has played an important role in the regulation of the Lancang River Hydropower Base after it was put into operation. The total installed capacity is 4.2 million kilowatts and the annual power generation capacity is 19 billion kilowatt-hours.
Panorama of Xiaowan Hydropower Station
Project introduction: The opening load meter matched by Weite is applied to the 3600KN fixed hoist hoist of the spillway of Xiaowan Hydropower Station, which plays an important role in the flood control and maintenance of the power station.
WTM-AS opening load meter and load sensor for Xiaowan Power Station
No.10 power station: Laxiwa Hydropower Station
Laxiwa Hydropower Station is the only hydropower station on the Yellow River among the top ten hydropower stations, with a total installed capacity of 4.2 million kilowatts and an annual power generation capacity of approximately 10.3 billion.
Project Introduction: In May 2019, the bridge crane, two-way portal crane, tail water trolley monitoring system and underwater visualization system project undertaken by Weite Technology Co., Ltd. were qualified by the power plant and passed the Xining Special Equipment Supervision Inspection, officially put into use.
The picture above shows the installation of a monitoring system to complete the lifting test
The picture above shows the part of the monitoring system installed by Weite
Anti-collision Load Test of Two Bridge Cranes in the Laxiwa Power Plant
There are a lot of them, and the top ten hydropower stations with installed hydropower capacity in the country all have Weite figures!
Since its establishment, Weite has always focused on the research of the safe operation of cranes, and has accumulated rich field experience in the hydropower industry, providing users with reliable information management solutions.
Today, Weite has developed into a crane safety protection expert, a domestic crane safety technology leader, and a preferred brand for large and important crane safety monitoring solutions.
If you have special needs, you can call Weite technical experts, we can design products and services according to your needs.
Add.:No.6 Gangcheng Road,Yichang,Free Trade Zone(Hubei) China 443005
86-15507209968(whatsapp)