Home > Products > New Lmi System---Customized models > Grove TMS 300B LMI computer Replacement

    Grove TMS 300B LMI computer Replacement

    WTAU Crane Parts team recently completed a successful Grove TMS 300B LMI computer replacement,the original lmi system was broken.
  • Category:
    New Lmi System---Customized models
  • Browse number:
    273
  • Release time:
    2019-09-18 16:30:47
  • Inquiry

  


WTAU Crane Parts team recently completed a successful Grove TMS 300B LMI computer replacement,

the original lmi system was  broken.


The WTL-A700 LMI Computer Replacement System Included:


1.New 8inch Color Touched LCD Display / Computer

2.Data Control Box & Software Programing

3.SHL TYPE Load Cell with Custom Mounting Hardware

4.Crane Length/Angle Sensor 

5.Anti Two Block Switch

6.Load Chart Programming


If you need assistance with a Telescopic All terrain Cranes use  LMI computer replacement 

contact us by +86-15507209968 (whatsapp)



GROVE TMS  300B LMI Computer Replacement Component

mobile crane LMI system  technical  solution.png



GROVE TMS 300B LMI Computer Replacement Options

grove 40t lmi installation.jpg

Have you thought about having a great crane Load Moment Indicator?


Load Moment Indicators, as the name suggests, is a way to know how much load is being lifted. 

With the help of simple electronic mechanisms, the crane operator can know a number of essential

things like how much weight is being lifted and also be warned if the load exceeds. In fact, 

many LMI’s, as Load Moment Indicators are called have a system where the crane stops functioning

when overloading occurs. The crane operator can know with ease all important data sitting right in the cabin


How does this help?


Overloading is one of the most common causes of crane accidents. With a good Load Monitoring System, 

that acts as a part of the overall safety warning system of the crane. The LMI compares the load capacity

of the crane taking into account a number of factors including weather conditions as well as the actual 

capacity of the crane. This will ensure that coworkers on the project as well as passerby’s are protected.


General information


Installing crane warning systems are a great way to ensure that your project is completed successfully. 

With the right Load Moment Indicator, you can rest assured that you can work with ease without worrying 

about crane accidents due to overloading.  A proper LMI system will warn the crane operator with   

buzzers and lights whenever overloading occurs thus ensuring that crane work is carried out safely and securely.


RELATED PRODUCTS

Contact us

Add.:No.6 Gangcheng Road,Yichang,Free Trade Zone(Hubei) China 443005

86-15507209968(whatsapp)

sales@wtau.com

Keywords
Load moment indicator(LMI), crane computer, safe load indicator, Overload limiter,Crane monitoring system,Anemometer, Load cell,Length/angle sensor,A2B Limit switch, Weite Technologies Co.,Ltd
Site map